Services · Website development · EV charging websites

Websites for UK charge point networks, installers and site hosts.

Codeeo delivers EV charging website development UK charge point operators, installers and host landlords use to win business and answer drivers. We build the public site around the things people search for: where your chargers are, what a session costs in pence per kWh, how to reach the helpline, how to request a home or workplace installation and how a landowner can host a hub. Every page is written for search, built for speed and editable by your own team.

The website sits beside your charging software rather than replacing it. It takes live status and tariffs from your back office, turns them into pages Google and drivers can read, and routes every enquiry to the right person with its source attached.

Built for
Charge point operators, installers, fleet electrification consultancies and property owners hosting chargers in England, Scotland, Wales and Northern Ireland.
Typical timeline
We agree scope, site count and integrations in discovery, then write the release dates into the plan before design begins.
What you own
The domain, the code, the CMS, the content, the analytics accounts and every enquiry record, held in accounts you control.
Rated
4.7 / 5 from 23 Google reviews

200+ companies servedFrom a first store to an ADX listed developer

Modon
Majid Al Futtaim
HP
Belkin
Dulsco Group
OneClickDrive
Hanayen
HMS
Clocksprings
Ghezlan

What the website includes

Pages and tools a national charging business needs online.

A charging company's website does several jobs at once. Drivers land on it from a map app wanting to know whether a site works and what it costs. Landowners and councils read it before shortlisting an operator. Homeowners and fleet managers arrive ready to request a quote. Investors and journalists look for proof that the network is real and growing.

The national rules shape the content too. The Public Charge Point Regulations 2023 brought in contactless payment, a staffed helpline available around the clock, reliability reporting for rapid networks and open data. A website that publishes pricing clearly, shows the helpline number on every location page and explains how to report a fault supports those duties in public. Below is what we usually build, ordered by how much traffic and revenue each part tends to carry for a multi-region operator.

Explain your project
  • Location pages for every site

    One indexable page per charging site, generated from your site data: address, connector types, power, access hours, parking rules, nearby amenities and a live status panel. Templates keep hundreds of pages consistent while letting your team add local notes, photos and directions. When a site is decommissioned, the page redirects to the nearest alternative instead of returning an error.

    Drivers searching a town name plus charging find your own page first.

  • Transparent tariff pages

    Prices shown in pence per kWh, with any overstay, idle or connection fees listed beside the headline rate so nothing appears only at the final step. Tariffs pull from your back office, so a change made once updates every page that mentions it.

    Clear pricing that matches what drivers see at the charger.

  • Helpline and fault reporting

    A support area with the 24 hour helpline number, a fault form that captures the charger ID from the location page, and answers to common problems such as a cable that will not release or a session that will not start.

    Fewer repeat calls and faults logged with the right charger attached.

  • Site host and landowner funnel

    Pages for retail parks, hotels, pubs, offices and car park owners that explain hosting models, revenue share options and the survey process, ending in a qualifying form that asks about parking spaces, grid capacity and land tenure.

    Host enquiries arrive with enough detail to book a feasibility call.

  • Installation quote requests

    For installers, guided forms for home, workplace and new build work, with photo upload of the consumer unit and driveway, postcode checks against your coverage and clear cancellation information for consumers buying at a distance.

    Quotes priced faster, with fewer return visits for missing information.

  • Fleet and depot enquiries

    A section for van, car and HGV fleets covering depot charging, home charging for drivers and public network access cards, with a form that asks about vehicle numbers, shift patterns and current depot supply.

    Fleet leads reach sales already sorted by size and need.

  • Open data and status feeds

    Structured data on location pages and a documented route for the OCPI based data your network already holds, so aggregators, councils and mapping services read the same facts your website shows.

    One version of the truth across your site and third party maps.

  • Nation and region hubs

    Separate hub pages for England, Scotland, Wales and Northern Ireland, and for each region you serve, linking down to towns and sites. Each hub carries its own funding, planning and procurement notes rather than one paragraph copied four times.

    Regional pages that rank and read as written for that place.

  • Smart charging and grant explainers

    Guides that explain the Smart Charge Points Regulations 2021, off-peak tariffs, solar pairing and any government grant routes that currently apply, written so a homeowner or office manager understands them. Each guide links to the matching quote form, and your team updates eligibility notes in the CMS when schemes change.

    Informational searches turn into qualified installation enquiries.

  • Investor, press and careers areas

    A newsroom, media kit and careers section managed in the CMS, with structured data for job postings so roles for engineers and site surveyors appear in search results.

    Proof of growth that stakeholders and candidates can find.

Who this is for

Four kinds of UK charging business we build sites for.

The audience on a charging website changes with the business model. A public network talks mostly to drivers and landowners. An installer talks to homeowners, developers and employers. A fleet consultancy talks to procurement teams. We plan the information architecture around whoever pays you, then make sure drivers can still find the help the law requires. These are the starting points we see most often across the country, and many businesses sit across two of them, such as an installer that also operates a small public network.

01

A public network growing across several regions

You have sites in many towns and a website that lists them in a single map widget search engines cannot read. We rebuild the site around crawlable location and region pages, link them to live status, and add a host enquiry route so the website helps you sign the next car park as well as serve the drivers using the last one. Council officers comparing operators for local infrastructure contracts also read these pages, so we give them a clear summary of coverage, reliability and support.

Location pages usually carry most of the organic traffic.

02

An installer covering homes, workplaces and new builds

Approved Document S means new homes and many non-residential buildings in England need charging provision, so developers and contractors now buy alongside homeowners. We separate those audiences, give each a clear quote path and explain smart charging requirements in plain terms so buyers understand what they are paying for. Consumers buying a home installation online have cancellation rights under the Consumer Contracts Regulations, and the quote and booking pages state them clearly before anyone signs.

03

A fleet electrification or depot specialist

Your buyers compare options over weeks and involve finance, operations and property teams. The site needs guides, depot planning explainers, downloadable briefs and enquiry forms that capture fleet size and timelines, connected to your CRM so the sales team can follow up in order.

04

A landlord, retailer or hotel group hosting chargers

You want guests and tenants to know charging exists, what it costs and how to use it, without running a full charging brand. We add charging sections to your existing site or build a small microsite that pulls tariffs and status from your operator partner.

Your operator partner keeps running the chargers.

How a charging website goes from brief to live across the UK.

  1. 01Discovery by video callWe review your business model, site list, back office, CRM and current analytics with your team remotely, then agree which audiences and enquiry types matter most.
  2. 02Site data and URL planWe map every charging location, region and service to a URL, decide which pages are generated from data and which are written by hand, and plan redirects from old URLs.
  3. 03Content and designPage templates for locations, tariffs, support, hosts and installs are designed and written together, so the copy fits the layout and the layout fits real data.
  4. 04Build and integrationsWe build the site, connect status and tariff feeds, wire forms into your CRM and helpdesk, and add structured data, consent management, analytics and conversion tracking for each enquiry type.
  5. 05Testing and launchAccessibility, speed, forms, redirects and data accuracy are checked across devices before launch, followed by Search Console monitoring for crawl and index problems.
  6. 06Growth after launchNew sites, regions and services are added through the CMS, and search and enquiry data guide the next round of content and template changes.

Technology

What we build this with.

We choose the stack around your data and your team: a headless CMS with Next.js where hundreds of location pages need to stay fast, or WordPress where marketing staff want familiar editing. Either way, the site reads from your charging platform rather than duplicating it, and hosting is set up in your own cloud account with backups, monitoring and security headers in place from launch day.

01Web

  • React
  • Next.js
  • TypeScript
  • Node.js
  • Laravel
  • WordPress

02Commerce

  • Shopify Plus
  • WooCommerce
  • BigCommerce
  • Headless storefronts

03Data and cloud

  • PostgreSQL
  • MySQL
  • MongoDB
  • AWS
  • Azure
  • Docker

04Marketing and tracking

  • GA4
  • Google Tag Manager
  • Search Console
  • Meta Pixel
  • Looker Studio

Questions UK charging businesses ask before a website project.

It depends on site count, integrations and how much content exists already.

A brochure site for an installer is a smaller job than a network site generating a page for every location with live status. The main variables are the number of page templates, whether tariffs and status come from an API, CRM and helpdesk connections, and how much copy your team can supply. We set the phases and dates in writing at the end of discovery, so you know what launches first and what follows.

Tell us what the business needs. We will tell you what to build first.

Schedule a free consultation and get a written recommendation, with costs, before you commit to anything.

Get in touch

PROVEN RESULTS

4.7 / 5from 23 Google reviews